  • Power station dead sea works  on natural gas combined cycle. the activated largest stations in the industry builds to its  on needs. This station replaced a diesel-generators Which were expensive and polluting. The station’s location, challenged the air pollutants dispersion. The location within the dead sea works before examining various alternatives and the establishment of the preliminary treatment station of natural gas – PRMS. The project served to confirm the National Council for planning and construction, prepared by Yozmot team:
  • compilted report and survey for natural gas risks
  • unique landscapes
  • air quality episode
  • environmental noise prevention
  • A topographical workland designated
  • methodology for the Ministry of environmental protection For the purpose of understanding AERMODE software products
  • Coordination with “Israel Natural Gas Lines Ltd” regarding the safe operating of PRMS
  • brine treatment and industrial wastewater

לכל הפרויקטים

Services Provided

  •  impact on the environmentalternative test
  • The team concentration in environmental planning INPUT
  • regional committees and the national team of planners in concentration INPUT to environmental planning
  • Checking the planning alternatives of the “dead sea work ltd” of existing infrastructure connection